LKAB and Stegra have signed a memorandum of understanding to advance their collaboration on the potential supply of direct reduction (DR) quality iron ore pellets to Stegra’s integrated green steel plant in Boden, Sweden. The agreement builds on their earlier announcement regarding planned test deliveries and sets out further joint work across commercial, technical and logistics areas.
The companies will work towards a long-term supply agreement, establish a structured testing programme for LKAB’s DR quality pellets and undertake detailed planning for rail-based deliveries from LKAB’s operations to Stegra’s plant in Boden. The technical programme will assess the physical, chemical and metallurgical performance of the pellets under conditions relevant to Stegra’s production process. The testing is intended to establish their suitability for use in the plant and support preparations for potential future deliveries.
Johan Menckel, President and Chief Executive Officer of LKAB, said the companies had been working together for some time and that expanding the collaboration made business sense for both organisations, the region and Sweden. He said LKAB’s high-quality iron ore could contribute to competitive, near-zero-emission value chains, strengthening Sweden’s industrial competitiveness while helping reduce emissions from the sector.
Håkan Buskhe, Chief Executive Officer of Stegra, said securing high-quality iron ore feedstock from Sweden had been part of the company’s plans from the outset. He said the next steps with LKAB would strengthen the Stegra project, reinforce Sweden’s industrial value chain and contribute to a more resilient Europe.
The memorandum also covers joint development and validation of the rail logistics arrangements required for a potential future supply. The work will address the complete logistics chain, including transport routes, terminal interfaces, loading and unloading facilities, train and wagon requirements, operational planning and contingency arrangements.
The companies aim to establish a reliable and efficient system for transporting iron ore pellets to Boden. Detailed planning of the rail network and associated infrastructure will be an important part of preparing for regular deliveries and supporting the operational requirements of Stegra’s green steel facility.
The expanded cooperation brings together LKAB’s iron ore resources and pellet production capabilities with Stegra’s plans to manufacture steel using lower-emission processes. The technical testing, commercial discussions and logistics planning will help determine the conditions for a long-term supply relationship.
Both companies see the collaboration as part of the wider development of a competitive Swedish industrial value chain and the transition towards lower-carbon steel production. The work will focus on establishing the technical and operational requirements needed to support potential future deliveries from LKAB to Stegra’s Boden plant.